Here is a sneak preview of what the bathroom is looking like.
We set the toilet last night and finished the inside plumbing. It sits off to the right of the tub.
This weekend I will build the shower curtain rod and get that installed but tonight we will be doing the outside plumbing and hooking the house up to the septic tanks and water supply.
The washer dryer combo will sit in the back right corner and will be installed at a later date.
Then it's out into the hallway and closet to get those areas done. It should take about two weeks to complete those I hope then on to the bedroom.
We are taking a month off of chili cooking so I am hoping to get something done on this huge project I put on myself, the pressure is building.
Gotta run,
Jerry
Thursday, February 19, 2015
Monday, February 9, 2015
Play and Work
I guess that's how my weekends go, one day for play and another for work.
Saturday we cooked chili down in Irving.
61 cooks showed up and 7 of those were the raining word champion and the other six were ex champs. Among the other folks there, Mexico and the Intercontinental champions, Texas Lady's State Champion, Texas Men's State Champion and eight out of the top ten current world ranked chili cooks were there.
So to say the deck was stacked is an understatement.
Long story short, Candy won 2nd place out of all those heavy hitters. I am so proud of her.
Sunday was nothing but working on the house. We decided to do the bathroom first and move out from there.
This weekend I tiled the floor and got started on the walls and ceiling. I really like this look and I will show some more as we get more done.
This week we will be finishing the walls and getting the tub, sink and toilet in place.
That's it for now,
Jerry
Saturday we cooked chili down in Irving.
61 cooks showed up and 7 of those were the raining word champion and the other six were ex champs. Among the other folks there, Mexico and the Intercontinental champions, Texas Lady's State Champion, Texas Men's State Champion and eight out of the top ten current world ranked chili cooks were there.
So to say the deck was stacked is an understatement.
Long story short, Candy won 2nd place out of all those heavy hitters. I am so proud of her.
Sunday was nothing but working on the house. We decided to do the bathroom first and move out from there.
This weekend I tiled the floor and got started on the walls and ceiling. I really like this look and I will show some more as we get more done.
This week we will be finishing the walls and getting the tub, sink and toilet in place.
That's it for now,
Jerry
Monday, February 2, 2015
A Little Bit Of Both
We finally got a little work done on the House, but first.....
Two weekends ago we went to College Station and cooked some Texas Red Chili with Jessie.
Our best friends and their daughter came with us and we had a great time. Neither me, Candy or Jessie placed in CASI chili, but I did win 2nd in Harley Davidson Show and Candy won 2nd in Peoples Choice Chili. It's a great cook off and we plan to go every year.
One day I will own one, maybe
Being I have been neglecting my first priority, the house, I worked on it every night after work and really made some progress this weekend.
I finished the plumbing throughout the whole house and pressurized all the lines to check for leaks. Then I installed the Hardi Backer for the floor in the Bathroom and got everything ready for the tile. After that I insulated the Bathroom Back Wall by putting two layers of R30 sheeting behind the pipes and R13 bats in front.
Candy went and bought the toilet, the bathroom sink, tub and sink fixtures, the tile and the wine barrel for the sink to sit on. This pic shows the tile color and what the sink will kinda look like on top of the barrel. The sink faucet will be one of those open flow types that is polished bronze. I think it looks like an old timey hand water pump.
The walls will be box planks we plan to pick up this week and start on.
As you can tell, we are working on the bathroom first, then the hallway and closet, then to the bedroom and finally the kitchen.
This week and weekend plans are to terminate the electrical through the whole house, tile the bathroom floor, pick up the bath tub, plumb in the drains for the tub, sink, toilet and washer. Then if I have any time left, I plan to start the box planks on the walls.
All that and we will also be cooking chili this weekend in Irving at a big cook off. We missed this one last year because we went to Rankin to cook, but this time we are staying close to home.
It's not much, but it's at least something.
See ya,
Jerry
Two weekends ago we went to College Station and cooked some Texas Red Chili with Jessie.
Our best friends and their daughter came with us and we had a great time. Neither me, Candy or Jessie placed in CASI chili, but I did win 2nd in Harley Davidson Show and Candy won 2nd in Peoples Choice Chili. It's a great cook off and we plan to go every year.
One day I will own one, maybe
Being I have been neglecting my first priority, the house, I worked on it every night after work and really made some progress this weekend.
I finished the plumbing throughout the whole house and pressurized all the lines to check for leaks. Then I installed the Hardi Backer for the floor in the Bathroom and got everything ready for the tile. After that I insulated the Bathroom Back Wall by putting two layers of R30 sheeting behind the pipes and R13 bats in front.
Candy went and bought the toilet, the bathroom sink, tub and sink fixtures, the tile and the wine barrel for the sink to sit on. This pic shows the tile color and what the sink will kinda look like on top of the barrel. The sink faucet will be one of those open flow types that is polished bronze. I think it looks like an old timey hand water pump.
The walls will be box planks we plan to pick up this week and start on.
As you can tell, we are working on the bathroom first, then the hallway and closet, then to the bedroom and finally the kitchen.
This week and weekend plans are to terminate the electrical through the whole house, tile the bathroom floor, pick up the bath tub, plumb in the drains for the tub, sink, toilet and washer. Then if I have any time left, I plan to start the box planks on the walls.
All that and we will also be cooking chili this weekend in Irving at a big cook off. We missed this one last year because we went to Rankin to cook, but this time we are staying close to home.
It's not much, but it's at least something.
See ya,
Jerry
Subscribe to:
Posts (Atom)